Ir para o conteúdo
energia renovavel
  • Home
  • We are MDC
  • Solutions
  • Operations
  • ESG
  • News
  • Publications
  • Contact us
  • Home
  • We are MDC
  • Solutions
  • Operations
  • ESG
  • News
  • Publications
  • Contact us
  • RI
  • PT
  • EN
  • RI
  • PT
  • EN
  • PT
  • PT
  • EN
  • EN

Operations

We operate biogas and natural gas projects in 8 states across the country, contributing to the energy transition.

BIOMETHANE AND NATURAL GAS

We operate across Brazil to serve our clients.

We develop, implement, operate, and manage complex natural gas and biogas projects.

solucoes energeticas limpas b

We operate in eight states across Brazil.

Check out some of our key partners:

solucoes energeticas limpas
solucoes energeticas limpas
solucoes energeticas limpas
solucoes energeticas limpas
solucoes energeticas limpas
solucoes energeticas limpas
solucoes energeticas limpas
solucoes energeticas limpas
solucoes energeticas limpas
solucoes energeticas limpas

Learn more about our subsidiaries and their operations:

solucoes energeticas limpas

A pioneer in biomethane production, Ecometano has played a key role in the regulation of biomethane in the country, being the first company to produce biomethane on a commercial scale. The company operates in all phases of a biomethane project – from project analysis and feasibility to commercialization and distribution of the gas, including biomethane purification technologies. We have proprietary technologies to generate biomethane from different sources (urban solid waste, sanitation waste, agrosilvopastoral waste, or the sugar-energy sector) to maintain a continuous supply of biomethane to the consumer market. Currently, it has three units in operation.

GNR Dois Arcos, projeto pioneiro da MDC para produção de biometano

GNR Dois Arcos

In operation since 2014, the unit is a pioneer in the capture and treatment of biogas generated from renewable sources for biomethane production.

The plant is part of Clean Development Mechanism and it prevents that 76,000 CO2 equivalent tons are released in the atmosphere every year, enabling greenhouse gas emission decrease, performing positively before future generations.

  • Located in São Pedro da Aldeia, Rio de Janeiro.
  • Installed capacity of 18,000 m³ of biomethane per day.
  • It produces biomethane from biogas captured at the Dois Arcos Landfill, with Osafi as a partner.
  • It was the first plant in Brazil to produce biomethane on a commercial scale.
  • It is certified by the RenovaBio program.
  • It issues biomethane traceability certificates, carbon credits, and decarbonization credits (CBIOs).
GNR Fortaleza, projeto pioneiro da MDC para produção de biometano

GNR Fortaleza

In operation since 2018, the plant captures and treats the biogas produced at the Oeste Municipal Landfill in Caucaia, a region that receives the majority of the solid waste generated in Greater Fortaleza. The unit is a national and international reference in biomethane production.

It prevents 600,000 tons of CO2 equivalent from being released into the atmosphere annually, helping to minimize greenhouse gas emissions and contributing positively to future generations.

The carbon credits from the unit can be issued through project 4209 of the Verified Carbon Standard to achieve reductions or removals of greenhouse gas emissions associated with the Verified Carbon Units (VCUs) of GNR Fortaleza Valorização de Biogás LTDA.

  • Conta com capacidade instalada de 105 mil m³/dia de biometano.
  • It is located in Caucaia, Ceará.
  • It captures and treats the biogas generated at the Oeste Municipal Landfill of Caucaia (ASMOC), responsible for managing the majority of the solid waste in the Fortaleza region.
  • The unit is the result of a partnership between MDC and Marquise Ambiental.
  • It was the first biomethane plant with injection into a pipeline and the first biomethane plant certified by RenovaBio.
  • It has the highest biomethane production efficiency at scale in Brazil.
  • The unit's production is directly injected into the distribution network of Companhia de Gás do Ceará (Cegás), currently representing approximately 20% of the state's natural gas consumption, which now has one of the highest percentages of renewable gas circulating in the network worldwide.
  • It was also a pioneer in the issuance and commercialization of biomethane traceability certificates.
Biometano Caieiras, nova operação da MDC

Biometano Caieiras

Inaugurated in 2024, the unit is the result of a partnership between MDC and Solví Ambiental. Authorized by the National Petroleum, Natural Gas, and Biofuels Agency (ANP), the plant has an installed capacity to produce approximately 70,000 m³/day of the biofuel.

Located in the municipality of Caieiras, in the metropolitan region of São Paulo, the plant processes the biogas captured by Solví Essencis at its Sustainable Valorization Unit (UVS), one of the largest landfills in the world. Covering an area of 3.5 million square meters and receiving 10,500 tons of waste daily, mainly from Greater São Paulo and other municipalities, the Caieiras UVS is an example of a circular economy, transforming waste into clean, renewable biofuel.

  • Production of approximately 70,000 m³ per day of biomethane.
  • Located in the third-largest landfill in the world.
  • The plant will be able to issue CBIOs (decarbonization credits) through the RenovaBio Program, further strengthening its commitment to sustainability.
solucoes energeticas limpas

ERB – Energias Renováveis do Brasil is a reference in the national market for the renewable production of electricity from steam generation through biomass, offering customized solutions and sustainable technologies to its clients. Currently, the company operates a unit in Bahia.

solucoes energeticas limpas

ERB Aratinga

Desde 2008, atua na geração de energia de biomassa. A partir de uma análise das necessidades de cada parceiro, a Companhia projeta, investe, constrói e opera plantas de cogeração de energia (vapor e eletricidade), oferecendo a seus clientes soluções customizadas e tecnologias sustentáveis. Atualmente, a ERB conta com uma unidade na Bahia.

  • Installed capacity: 150 ton/h of steam - 16.8 MW of energy
  • Operation start: April, 2014
solucoes energeticas limpas

Brazil´s largest compressed natural gas (CNG) marketing; and it delivers, apart from CNG, liquefied natural gas (LNG), natural gas for vehicles (NGV) and biomethane to 45 cities that did not have access previously. Established in 2006, the company services especially industrial customers.

solucoes energeticas limpas
  • Brazil´s largest gas supplier
  • Experience at raw, treated natural gas and biomethane marketing;
  • Operation in natural gas chain, focusing on gas acquisition in small and mid-size onshore producers, taking over responsibility for natural gas treatment, separation, compression and marketing, from producer to end customer.
  • Several product logistic expertise, including long routes with several deliveries.
  • Operation central that manages all chain online 24/7: operation safety and quality assurance.
  • The internal engineering team develops customized solutions to each customer, using the best technologies available in the market.
  • It gathers commercial, logistic, technical and regulatory expertises to develop production and/or consumption isolated or connected to the network.
  • Capacidade instalada: 300.000 m³/dia.
  • Activities: Gas compression, transport, delivery, operation, lease and marketing (natural gas and biomethane).

A pioneer in biomethane production, Ecometano has played a key role in the regulation of biomethane in the country, being the first company to produce biomethane on a commercial scale. The company operates in all phases of a biomethane project – from project analysis and feasibility to commercialization and distribution of the gas, including biomethane purification technologies. We have proprietary technologies to generate biomethane from different sources (urban solid waste, sanitation waste, agrosilvopastoral waste, or the sugar-energy sector) to maintain a continuous supply of biomethane to the consumer market. Currently, it has three units in operation.

GNR Dois Arcos, projeto pioneiro da MDC para produção de biometano

GNR Dois Arcos

In operation since 2014, the unit is a pioneer in the capture and treatment of biogas generated from renewable sources for biomethane production.

The plant is part of Clean Development Mechanism and it prevents that 76,000 CO2 equivalent tons are released in the atmosphere every year, enabling greenhouse gas emission decrease, performing positively before future generations.

  • Located in São Pedro da Aldeia, Rio de Janeiro.
  • Installed capacity of 18,000 m³ of biomethane per day.
  • It produces biomethane from biogas captured at the Dois Arcos Landfill, with Osafi as a partner.
  • It was the first plant in Brazil to produce biomethane on a commercial scale.
  • It is certified by the RenovaBio program.
  • It issues biomethane traceability certificates, carbon credits, and decarbonization credits (CBIOs).
GNR Fortaleza, projeto pioneiro da MDC para produção de biometano

GNR Fortaleza

In operation since 2018, the plant captures and treats the biogas produced at the Oeste Municipal Landfill in Caucaia, a region that receives the majority of the solid waste generated in Greater Fortaleza. The unit is a national and international reference in biomethane production.

It prevents 600,000 tons of CO2 equivalent from being released into the atmosphere annually, helping to minimize greenhouse gas emissions and contributing positively to future generations.

The carbon credits from the unit can be issued through project 4209 of the Verified Carbon Standard to achieve reductions or removals of greenhouse gas emissions associated with the Verified Carbon Units (VCUs) of GNR Fortaleza Valorização de Biogás LTDA.

  • Conta com capacidade instalada de 105 mil m³/dia de biometano.
  • It is located in Caucaia, Ceará.
  • It captures and treats the biogas generated at the Oeste Municipal Landfill of Caucaia (ASMOC), responsible for managing the majority of the solid waste in the Fortaleza region.
  • The unit is the result of a partnership between MDC and Marquise Ambiental.
  • It was the first biomethane plant with injection into a pipeline and the first biomethane plant certified by RenovaBio.
  • It has the highest biomethane production efficiency at scale in Brazil.
  • The unit's production is directly injected into the distribution network of Companhia de Gás do Ceará (Cegás), currently representing approximately 20% of the state's natural gas consumption, which now has one of the highest percentages of renewable gas circulating in the network worldwide.
  • It was also a pioneer in the issuance and commercialization of biomethane traceability certificates.
Biometano Caieiras, nova operação da MDC

Biometano Caieiras

Inaugurated in 2024, the unit is the result of a partnership between MDC and Solví Ambiental. Authorized by the National Petroleum, Natural Gas, and Biofuels Agency (ANP), the plant has an installed capacity to produce approximately 70,000 m³/day of the biofuel.

Located in the municipality of Caieiras, in the metropolitan region of São Paulo, the plant processes the biogas captured by Solví Essencis at its Sustainable Valorization Unit (UVS), one of the largest landfills in the world. Covering an area of 3.5 million square meters and receiving 10,500 tons of waste daily, mainly from Greater São Paulo and other municipalities, the Caieiras UVS is an example of a circular economy, transforming waste into clean, renewable biofuel.

  • Production of approximately 70,000 m³ per day of biomethane.
  • Located in the third-largest landfill in the world.
  • The plant will be able to issue CBIOs (decarbonization credits) through the RenovaBio Program, further strengthening its commitment to sustainability.

Brazil´s largest compressed natural gas (CNG) marketing; and it delivers, apart from CNG, liquefied natural gas (LNG), natural gas for vehicles (NGV) and biomethane to 45 cities that did not have access previously. Established in 2006, the company services especially industrial customers.

solucoes energeticas limpas
  • Brazil´s largest gas supplier
  • Experience at raw, treated natural gas and biomethane marketing;
  • Operation in natural gas chain, focusing on gas acquisition in small and mid-size onshore producers, taking over responsibility for natural gas treatment, separation, compression and marketing, from producer to end customer.
  • Several product logistic expertise, including long routes with several deliveries.
  • Operation central that manages all chain online 24/7: operation safety and quality assurance.
  • The internal engineering team develops customized solutions to each customer, using the best technologies available in the market.
  • It gathers commercial, logistic, technical and regulatory expertises to develop production and/or consumption isolated or connected to the network.
  • Capacidade instalada: 300.000 m³/dia.
  • Activities: Gas compression, transport, delivery, operation, lease and marketing (natural gas and biomethane).

ERB – Energias Renováveis do Brasil is a reference in the national market for the renewable production of electricity from steam generation through biomass, offering customized solutions and sustainable technologies to its clients. Currently, the company operates a unit in Bahia.

solucoes energeticas limpas

ERB Aratinga

Desde 2008, atua na geração de energia de biomassa. A partir de uma análise das necessidades de cada parceiro, a Companhia projeta, investe, constrói e opera plantas de cogeração de energia (vapor e eletricidade), oferecendo a seus clientes soluções customizadas e tecnologias sustentáveis. Atualmente, a ERB conta com uma unidade na Bahia.

  • Installed capacity: 150 ton/h of steam - 16.8 MW of energy
  • Operation start: April, 2014

Our operations are aligned with the best market practices.

Sustainability is inherent to MDC’s operations. Every year, the company conducts its emissions inventories, following the GHG Protocol Brazil methodology, an institution of which MDC is a member. MDC’s inventories have received the Silver Seal from the organization, certifying its transparency in emissions reporting.

MDC Energia reforça compromisso ESG monitorando suas emissões de carbono

Entre em contato conosco:

Our team is at your disposal!

Send us your partnership requests, budget inquiries, or questions. We're here and ready to respond promptly!

Social media (Only in Portuguese)

Av. Almirante Barroso, 52, 23º andar, Sala 2302, Centro (RJ). Telefone: (21) 3043-4999.

1632 Tancredo Neves Avenue, South Tower, Suites 201 to 206, Salvador Trade Center Building, Salvador (BA), Brazil.

Press Contact

comunicacao@mdcenergia.com.br

Supplier Registration:

Click the icon next to this text to register in our database.

energia renovavel logo mdc
  • We Are MDC
  • Purpose
  • Projects
  • Culture
  • Reports
  • Contact
Copyright ©2026 MDC

Privacy Policy

Criação de Site por UpSites

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in .

lgpd logo
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.